Commercial model
No public kWh rate. A quote you can inspect.
METEORIC does not publish a generic power or gas rate because load profile, delivery year, site structure, and EEX market levels determine the procurement price. The commercial model is still transparent: procurement cost plus a fixed markup, with no hidden risk premium.
What determines price
- Annual consumption in GWh and number of sites
- Load profile, baseload share, peaks, and utilisation hours
- Delivery year, contract term, and target budget corridor
- Current EEX futures and short-term market outlook
- Power, gas, green certificates, and optional grid-fee analysis
What you see before signing
- Indicative procurement price and key assumptions
- Stop-loss guardrail and tranche logic
- Fixed METEORIC markup on the procurement price
- Monthly reporting and decision documentation
- Next steps, required data, and timeline
Path to an offer
- 01 30-minute procurement check with Miguel Conty
- 02 Share load profile, invoice, or site data
- 03 Strategy, price assumptions, and offer within five business days
Start with the free procurement check. You see price, assumptions, and fixed markup before signing anything.
Get a second opinion